Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: 2013 - November 2016 Client: Highways Department

Project details:

 

Main Contractor

Dragages-China Harbour-VSL JV

 

E&M Consultant

Mott MacDonald

 

General Description

 

Design and construction project for a dual 3-lane carriageway in the form of a 9.4km-long viaduct from the HKSAR boundary (connecting with the Hong Kong-Zhuhai-Macau main bridge) to Scenic Hill (connecting with the tunnel under separate contract) with a hard shoulder for each bound of carriageway and a utilities trough on the outer edge of each bound of viaducts.

 

Infrastructure
MTR - SCL 1128
MTR – SCL 1177 Shatin to Central Link: Building Services for TKW and TKA
Express Railway Link 816M
Liantang-Heung Yuen Wai Boundary Control Point
Shatin Sewage Treatment Works
Hong Kong-Zhuhai-Macao Bridge (Hong Kong Link Road – Section between HKSAR Boundary and Scenic Hill)
CLP Cable Tunnel at Castle Peak
East Tsing Yi Viaduct
Four CLP Cable Tunnels
MTR East Rail Extension LCC300 Lok Ma Chau Terminus & Assoicated Works
MTR East Rail Sheung Shui to Chau Tau Tunnels
KCRC West Rail Contract DB350 Tai Lam Tunnel