Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: Phase 1: May 2018 - November 2018, Phase 2: December 2018 - August 2019 Client: Hong Kong University of Science and Technology

Project details:

Architect

Ryder

Main Contractor

ISG

E&M Consultant

BuroHappold Engineering

 

General Description

The project comprises of refurbishment and expansion work for the HKUST (Building) level 7 zones L. Lb and H. This floor will be used as an animal housing facility (ACF) which will have the following areas:

-                      Offices area

-                      A security barrier: Perimeter of the ACF

-                      A procedural barrier: Changing room, laundry and Material lock

-                      A Biosecurity barrier: Designated room and support.

-                      Within the biosecurity barrier:

·                     Biocontainment category 2 laboratory (CL2) barrier facility

·                     Surgery area

·                     Holding rooms

·                     Cagewash area and stores

·                     Culling and Necropsy

·                     Circulation

Facility Management
AWE - MVAC Ice Thermal Storage
HKUST Animal Care Facility
MVAC Maintenance
Preventive Maintenance Contract for Hopewell Holdings Ltd
Facility Management for Hopewell centre and Hopewell group office
Facility Management for Panda Place
Facility Management for HKTDC
Facilty Managment for Hong Kong Baptist University
Facilty Managment for AsiaWorld-Expo