Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: Phase 1: May 2018 - November 2018, Phase 2: December 2018 - August 2019 Client: Hong Kong University of Science and Technology

Project details:

 

Architect

Ryder

 

Main Contractor

ISG

 

E&M Consultant

BuroHappold Engineering

 

General Description

The project comprises of refurbishment and expansion work for the HKUST (Building) level 7 zones L. Lb and H. This floor will be used as an animal housing facility (ACF) which will have the following areas:

-                      Offices area

-                      A security barrier: Perimeter of the ACF

-                      A procedural barrier: Changing room, laundry and Material lock

-                      A Biosecurity barrier: Designated room and support.

-                      Within the biosecurity barrier:

·                     Biocontainment category 2 laboratory (CL2) barrier facility

·                     Surgery area

·                     Holding rooms

·                     Cagewash area and stores

·                     Culling and Necropsy

·                     Circulation

 

Scope of Works
Supply, installation and T&C of all E&M services:
MVAC
• Central refrigeration plant
• Cooling Distribution
• Heating Plant
• Heating Distribution
• Air Conditioning Systems
• Ventilation and Exhaust air Fire
Service systems
• Smoke Control Systems
• Hot water services
• Cold water services
• Treated water services
• Thermal Insulation
• Water Treatment
• Noise and Vibration control
• Automatic Controls
• Building Management Systems
• Mechanical services field wiring
• Compressed Air systems
• Testing and Commissioning of the Mechanical Services

Electrical and ELV
• LV distribution and Switchgear
• Emergency Generation
• Uninterruptible Power Supplies
• LV Sub mains distribution
• General and Emergency Lighting Installation
• Lighting Control Systems
• Emergency Lighting
• Security Systems
• CCTV systems
• Access Control systems
• Fire alarm system
• Data Installation
• Lightning Protection
• Earthing and Bonding

Fire Services
• Sprinkler system and hose reel

Plumbing & Drainage
• Localized surveys within the building to establish connection points to existing drainage and water systems and installation locations of new plant equipment in exiting plant room.
• New drainage and vent services connecting to existing building’s services.
• New domestic cold and hot water services.
• New laboratory softened cold and hot water services.
• Treated water services.
• Connection to sanitary fittings.
• Compressed air systems.
• Drainage connections serving new plant equipment located in
• Testing and Commissioning of the Plumbing Services
Facility Management
Facilty Managment for AsiaWorld-Expo MVAC Maintenance and Operation Agreement
HKUST Animal Care Facility
MVAC Maintenance
Facility Management for Hopewell Centre and Hopewell group office
Facility Management for Panda Place
Facility Management for HKTDC
Facilty Managment for Hong Kong Baptist University
Facilty Managment for AsiaWorld-Expo