Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: April 2018 - September 2018 Client: AsiaWorld-Expo Management Limited

Project details:

 

General Description

AsiaWorld-Expo Management Limited is responsible for the management of AsiaWorld-Expo.

AsiaWorld-Expo located at Hong Kong International Airport, Lantau, Hong Kong, is Asia’s leading exhibition, convention and events venue.

This is an energy efficiency improvement project consisting in an air cooled chiller system upgrade to water cooled chiller system.

 

Scope of Works
Chiller replacement work including design, supply, delivery, installation and testing & commissioning:

• 1 no. of water cooled chiller
• 1 no. of cooling tower
• 2 nos. of condensing water pump
• 1 no of chilled water pump
• 2 nos. of water tank
• Steel platform for chiller ,cooling tower and water tanks
• Pipework and insulation
• Power panel
• Chemical dosing equipment
• Control equipment and Building Management System
Renovation / A&A Works
French International School – Chiller Replacement
HKJC - Renovation Works for Public Betting Hall
Hong Kong Adventist Hospital - Mechanical Ventilation & MVAC System
AWE - Water Cooled Chiller & Cooling Tower Supply & Installation
XRL 8230
Renovation Works for Goldman Sachs HK CKC
HSBC Centre - Drainage Pipeworks Upgrade
HKJC - Fire Services Improvement Directory (FSID) Essential Works
HKIA - Ventilation Improvement at GTC Bus Terminus and Taxi Pick-up Area
HSBC Main Building - Replacement of Fire Services Inlets Pipework & Jockey Pumps
HKUST - New Transformer Room
HKJC - E&M 2017
Aberdeen Marina Club L8 New Game Room A&A Works
Supply VSD for AHU at Le Prestige
Renovation Works (Plumbing & Drainage) for Central Government Office
MVAC and Light Work
HKJC - EPD Emission Reduction Targets at Sha Tin Racecourse
French International School - Chiller Replacement at R/F
HKJC - SCTH & GS2 Chiller Plant A&A
HSBC Centre - Installation of Replacement Chillers
HKJC - Headquarters Busduct System Replacement
HKJC - SCTC 8/F & R/F Fitting Out Works
Office Fit-Out works for Schneider Electric at 11/F & 19/F Kerry Centre, Quarry Bay
HKJC - Floodlight Replacement Project
HKJC - Air-Conditioning Infrastructure Upgrade
HKJC - Term Contract for E&M Installation
HKIA - Chilled Water Pump Improvement Works for New CIP Lounge at North Concourse of T1
EMSD - Replacement of AHU at HK Museum of Art, HK Space Musesum, HK Science Museum and HK Coliseum
Modification of ECS at Tsim Sha Tsui MTR Station
Mandarin Oriental Hotel - Renovation Works Contract for the Main E&M Work Package
Cityplaza South
Excelsior Hotel - FSD (HAD) Upgrade
EMSD - Replacement of Package Chillers at Choi Hung Road Sports Centre & Improvement of Ventilation at Lei Yue Mun Public Library
EMSD - Replacement of AC System at Aberdeen Police Training College
Hong Kong Heritage Museum at Shatin Track Lights & False Ceiling Installation
Alliance Francaise (Jordan Centre)
HKJC Facilities Improvement - Foodcourt & Trackside Kiosk at Shatin Racecourse
Mandarin Oriental Hotel Hong Kong - Chillers Plant Replacement
Mandarin Oriental Hotel Hong Kong - Renovation for Function Roon at 2/F