Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: March 2016 - February 2019 Client: Panda Place Management

Project details:

General Description

Panda Place is located at Tsuen Wah Street, Tsuen Wan and it is 3-year term contracts for the maintenance works, operation and repair work for Chiller plant and Mechanical Ventilation Air-conditioning Systems at Panda Place.

Scope of Works
Maintenance service for the following building services:
• Daily operation services for MVAC system
• Emergency Call Services
• Routine maintenance of weekly, monthly and annual as below equipment:
- Water cooled chiller
- Cooling towers
- Chilled water pump
- Condenser water pump
- Airside equipment (AHU, PAU, FCU and Ventilation system

• Equipment list
- Water-cooled screw chiller ~ 2 sets Total 700 RT
- Chilled water pump ~ 3 sets
- Condenser water pump ~ 3 sets
- Primary Air-handling Unit ~ 7 nos.
- Fan Coil Unit ~Over 430 nos.
- Ventilation fan ~Over 20 nos.
Facility Management
Facilty Managment for AsiaWorld-Expo MVAC Maintenance and Operation Agreement
HKUST Animal Care Facility
MVAC Maintenance
Facility Management for Hopewell Centre and Hopewell group office
Facility Management for Panda Place
Facility Management for HKTDC
Facilty Managment for Hong Kong Baptist University
Facilty Managment for AsiaWorld-Expo