Building Renovation / A&A Works Facility Management Infrastructure
Contract Period: April 2014 - September 2018 Client: Mass Transit Railway Corporation

Project details:

E&M Consultant

ARUP

 

General Description

The Shatin to Central Link (SCL) is a strategic railway line that runs through multiple districts in Hong Kong to strengthen the current railway networks by connecting several existing lines through a number of interchange stations. This contract covers the building services for Ma Tau Wai Station and Ancillary Building.

 

Scope of Works
Design, manufacture, supply, delivery, installation, testing, setting to work, test running, commissioning, maintenance and rectification of defects during the Defects Liability Period of the Building Services (in JV with Southa Technical):
• Environmental Control System
• Electrical Service Systems
• Station Based Control System
• Fire Services
• Plumbing & Drainage System
• Condition Based Maintenance System
Infrastructure
MTR - SCL 1128
MTR – SCL 1177 Shatin to Central Link: Building Services for TKW and TKA
Express Railway Link 816M
Liantang-Heung Yuen Wai Boundary Control Point
Shatin Sewage Treatment Works
Hong Kong-Zhuhai-Macao Bridge (Hong Kong Link Road – Section between HKSAR Boundary and Scenic Hill)
CLP Cable Tunnel at Castle Peak
East Tsing Yi Viaduct
Four CLP Cable Tunnels
MTR East Rail Extension LCC300 Lok Ma Chau Terminus & Assoicated Works
MTR East Rail Sheung Shui to Chau Tau Tunnels
KCRC West Rail Contract DB350 Tai Lam Tunnel